Scheduling Bay

Built for Microsoft Dynamics 365 Business Central

AI-driven production scheduling, built into Business Central.

Pacer Production Scheduler turns chaotic Business Central production orders into a material-aware, finite-capacity schedule you can actually run — no spreadsheets, no separate app.

Capacity Gantt — Pacer Production Scheduler
Pacer Production Scheduler Capacity Gantt — a material-aware, finite-capacity production schedule inside Business Central
Introduction — Pacer Production Scheduler

Sound familiar?

Material surprises — jobs start, then stall waiting on parts that never arrived.
Double-booked machines — two jobs, one machine, and a plan nobody can run.
A schedule that’s obsolete by 10 a.m. — the office plan and the shop floor already disagree.

Why Pacer Production Scheduler

Material-aware, not just capacity-aware

Green / Yellow / Red status feeds the Pacer Production Scheduler scheduling engine, not just the display. Pacer Production Scheduler won’t book a machine for a job whose parts aren’t there yet.

Finite capacity — an achievable plan, always

One job per machine at a time. What’s on the board is what happens on the floor.

Cut changeover waste

Sequence-dependent setup times capture what actually slows a changeover — material, tooling, cleaning, whatever drives it in your shop — and minimize total setup across the run.

Experiment safely, then commit

Drag-and-drop Gantt with draft scenarios. Nothing touches your live schedule until you promote it to production.

Built into Business Central

A native BC extension — installs from AppSource, and planners work right inside BC. No separate app, no data re-entry.

Familiar in minutes

BC-native UI, a guided setup, one-click demo data, and a conversational setup assistant.

Install from AppSource in minutes.

Pacer Production Scheduler installs as a native Business Central extension.