Production scheduling for furniture manufacturing

The pain

Furniture is made-to-order variety on top of long BOMs — wood, hardware, foam, fabric, finishes. One late component or a specific fabric that hasn’t arrived stalls the whole build. And every finish or color change means cleaning and setup, so running jobs in the wrong order quietly burns hours between them.

How Pacer Production Scheduler helps

  • The material-availability floor holds a build until its parts are actually on hand — no job scheduled around a fabric or hardware line that isn’t in yet.
  • Sequence-dependent setup times capture finish, color, and tooling changeovers, then sequence jobs to minimize total setup across the run.
  • Finite capacity keeps the plan honest — one job per station at a time, so the schedule you print is one the floor can actually run.
  • Capable-to-promise dates give sales realistic ship dates from a finite, material-aware schedule.

The payoff

Made-to-order builds sequenced to cut changeover waste, fewer jobs stranded by a late component, and delivery dates you can quote with confidence.