Production scheduling for metal fabrication
The pain
Fabrication schedules live or die on physical constraints the ERP ignores: a part can’t move to assembly until it’s out of heat treat, and it can’t be painted until the line is free and cured.
How Pacer Production Scheduler helps
- Models real process constraints (cure/soak/cool-down) instead of pretending capacity is infinite.
- Balances load across cutting, forming, welding, finishing.
- Keeps changeover waste down with setup-aware sequencing.
The payoff
Fewer parts stuck between stages, finishing lines that stay fed, and promise dates you can stand behind — all planned against the real constraints of your shop instead of an idealized model.