Scheduling Bay

Meet Pacer Production Scheduler

Material-aware, finite-capacity production scheduling — built into Business Central.

How it works

Step 1

See material readiness

Green / Yellow / Red status across every order, at a glance.

Step 2

Optimize

One click packs orders into a finite-capacity, material-aware schedule.

Step 3

Refine on the Gantt

Drag-and-drop with live guardrails — you can’t double-book or start before material lands.

Step 4

Promote to production

Nothing goes live until you commit. A recovery snapshot is taken automatically.

Features

Scheduling core

  • Finite capacity
  • Gap-filling optimizer
  • Shift-aware
  • Priority dispatch (commitment → due date)
  • Alternate routings & load balancing

Material intelligence

  • Traffic-light material status
  • Material-availability floor (EMAD)
  • Recalc on receipts & postings
  • Material pegging
  • Material constraint modes

Changeovers

  • Sequence-dependent setup times
  • Attribute-driven changeovers
  • Per-machine setup rules
  • Exception overrides

Planner control

  • 4-level operation locks
  • Machine-down evacuation & recovery
  • Off-shift & non-interruptible policies

Visibility

  • Capacity Gantt
  • Dispatch Board
  • Capacity load histogram
  • Problems list
  • Operator daily work list

Plan & promise

  • Capable-to-promise dates
  • Draft snapshots
  • Schedule comparison (KPI deltas)

Curious about the AI layer? See the AI story →